2021 marks

An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular state. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in next two years by 20 June, 2021, since this project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by the inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that minimum three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of inspecting team on the ground that it was a minor crack that will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of the inspecting team and continue working with same speed and tempo. He informed you that the minister does not want any delay as he wants the chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is far relative of the minister and he wants him to finish the project. He also gave you hint that your further promotion as additional chief engineer is under consideration with the ministry. However, you strongly felt that the minor crack in the pier of the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor. 1) Under the given conditions, what are the options available to you as a project manager? 2) What are the ethical dilemmas being faced by the project manager? 3) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges? 4) What can be the consequences of overlooking the observation raised by the inspecting team?

Q12No match yet
2013 marks

You are working as an Executive Engineer in the construction cell of a Municipal Corporation and are presently in-charge of the construction of a flyover. There are two Junior Engineers under you who have the responsibility of day-to-day inspection of the site and are reporting to you, while you are finally reporting to the Chief Engineer who heads the cell. While the construction is heading towards completion, the Junior Engineers have been regularly reporting that all construction is taking place as per design specifications. However, in one of your surprise inspections, you have noticed some serious deviations and lacunae which, in your opinion, are likely to affect the safety of the flyover. Rectification of these lacunae at this stage would require a substantial amount of demolition and rework which will cause a tangible loss to the contractor and will also delay completion. There is a lot of public pressure on the Corporation to get this construction completed because of heavy traffic congestion in the area. When you brought this matter to the notice of the Chief Engineer, he advised you that in his opinion it is not a very serious lapse and may be ignored. He advised for further expediting the project for completion in time. However, you are convinced that this was a serious matter which might affect public safety and should not be left unaddressed. What will you do in such a situation? Some of the options are given below. Evaluate the merits and demerits of each of these options and finally suggest what course of action you would like to take, giving reasons. 1) Follow the advice of the Chief Engineer and go ahead.

Q1No match yet
AIR 1–100 Topper Repository

Topper Value Additions & Evidence Bank for Accountability and Ethical Governance

Access 19,145+ curated quotes, committee reports, judgments, data points, and diagram redraws extracted directly from real UPSC Mains topper answer sheets.

Explore All Value Additions →
Quotes & Hooks

Ready-to-use intro & conclusion hooks used by toppers.

Committees & Reports

ARC2, NITI Aayog, Law Commission & Economic Survey data.

Data Points & Facts

Verified stats for GS1, GS2, GS3 & GS4 papers.

Diagrams & Redraws

High-yield maps, flowcharts & schematics from topper copies.